| Employer: | BALFOUR BEATTY RAIL GmbH (Germany) | | Project: | Dupnitza to Kulata Railway Project | | Subproject: | Design, electrical installation, start up and adjustment works | | Design: | | | Main contractor: | “Start engineering” JS Co. | | Subcontractors: | | | Kinds of activities: | Delivery and fabrication of electric panels, installation works and starting up and adjustment works. | | Performance: | Finished in 2001. |
|
Short information concerning the project:
"Start Engineering" JS Co. - Sofia branch is a main contractor of Electrical installation and Start up and tuning works, commissioning of power supply, electric lighting and L.V. crossings at 14 railway stations, 10 railway halts and linesman's lodges. The separate subprojects include in general the installation of 24 poles for floodlights, 74 railway posts, 845 luminaires, 4 mast transformers, 49647 m of cables in excavation, fabrication and delivery of 83 electric panels.
Start up and tuning works on commissioning of "Simitli" and "Gen. Todorov" 110/27,5 kV traction substations were performed.