¤ Home » International projects
"Start Engineering" JSCo. has established traditions for a range of engineering activities that provide a full cycle of implementation of the company's projects overall process of providing services. In recent years, the company pays particular attention to the development of business abroad, where our team is involved in major projects, partnering with the biggest and most established companies in the sector.
Projects with cooperaton of ABB
Projects with cooperaton of Metso Automation
Projects with cooperaton of TaiSei Corporation
Project: Paper Mill Factory MODO Paper Alizey, France
| Project details |
| User company: |
Metso Automation S.A.S, France |
| Brief information: |
Implementation of MetsoDNA system |
| Scope of work: |
Participation in design of the system; Participation in FAT |
Project: Termal Power Plant Agios Dimitrios, Greece
| Project details |
| User company: |
Metso Automation GmbH, Austria |
| Brief information: |
Implementation of MetsoDNA system on Unit III & Unit IV |
| Scope of work: |
Participation in the commissioning works |
Project: Termal Power Plant Kristina, Finland
| Project details |
| Brief information: |
Implementation of MetsoDNA IA system |
| Scope of work: |
Implementation of DNA ProCalc packages |
Project: Paper Mill Factory SAICA Venizel, France
| Project details |
| User company: |
Metso Automation S.A.S, France |
| Brief information: |
Implementation of MetsoDNA system |
| Scope of work: |
Participation in design of the system; Participation in FAT; Participation in the commissioning works |
Project: Paper Mill Factory CELBI, Portugal
| Project details |
| User company: |
Metso Automation S.A.S, France |
| Brief information: |
Implementation of MetsoDNA system |
| Scope of work: |
Participation in design of the system, Participation in FAT, Participation in the commissioning works |
Project: Termal Power Plant Kaana Pori, Finland
| Project details |
| User company: |
Metso Automation Oy, Finland |
| Brief information: |
Implementation of MetsoDNA IA system |
| Scope of work: |
Implementation of DNA ProCalc packages |
Project: Biochemical Plant SENSUS, Netherland
| Project details |
| User company: |
Metso Automation BV, Netherland |
| Brief information: |
Implementation of MetsoDNA system |
| Scope of work: |
Participation in design of the system; Participation in FAT; Participation in the commissioning works |
Project: Hydro Electric Power Plants "Ataturk" and "Karakaya" – Turkey
| Project details |
| User company: |
EUAS-Turkey |
| Brief information: |
Replacement of old BBC Decontic control system and BECOS supervisory system with new ABB Industrial IT 800xA (AC870P Melody) control system and HMI.
Modernization of Turbine governors and Excitation systems in order to cover UCTE requirements for primary and secondary control. |
| Scope of project for HEPP “Ataturk” (2400MW): |
- 8 units x 300 MW (for each unit – 3 redundant AC870P Melody controllers:
- for Turbine Governor,
- for Mechanical Protection.
- for Unit control and auxiliaries.
- Approximate amount of 800 IOs per unit.
- S800 (Profibus) and Melody IO cards used.
- For each unit new AVR regulators ABB Unitrol 5000 are delivered with PSS option.
- New generator protections ABB REG316, RET3160, REX010
- Replacement of Teleprotection system Power House-Switchyard (FOX)
- Auxiliary Turbine 10MW (2 redundant AC870P Melody controllers, AVR – Unitrol 1000),
- 0.4kV and 6 kV distributions and Automatic Transfer System (1 AC870P Melody controller),
- Spillway, Bottom Outlet, Dam Drainage, Power Intake zones (2 redundant AC870P Melody controllers),
- Plant Joint Controller and backup interface to 380kV switchyard (Modbus) (1 AC870P Melody controller),
- ABB RTU560 and Network Manager for interface of 34kV,154kV, and 380 kV switchyards.
|
| Scope of project for HEPP “Karakaya” (1800MW): |
- 6 units x 300 MW (for each unit – 3 redundant AC870P Melody controllers:
- for Turbine Governor,
- for Mechanical Protection.
- for Unit control and auxiliaries.
- Approximate amount of 800 IOs per unit.
- S800 (Profibus) and Melody IO cards used.
- For each unit new AVR regulators ABB Unitrol 5000 are delivered with PSS option.
- New generator protections ABB REG316, RET3160, REX010
- Replacement of Teleprotection system Power House-Switchyard (FOX)
- 0.4kV and 6 kV distributions and Automatic Transfer System, Plant Joint Controller and backup interface to 380kV switchyard (Modbus) (1 AC870P Melody controller),
- Spillway, Bottom Outlet zones (1 redundant AC870P Melody controllers),
- ABB RTU560 and Network Manager for interface of 34kV,154kV, and 380 kV switchyards.
|
| ABB 800xA HMI: |
Includes system and configuration servers, Operator stations with Large screen displays, Process Panels, Historian and alarm servers, OPC servers. |
Project: Guigang Hydro Power Plant, China
| Project details |
| User company: |
ABB Power Generation, Switzerland |
| Brief information: |
Control and Supervision System (ABB Advant OCS) of the Power Plant, covering 4 Units (x 32 MW), 110 kV and 35 kV Switch yards and Auxiliary Systems |
| Scope of work: |
Participation in Commissioning Works |
Project: Three Gorges Hydro Power Plant (Left bank), China
| Project details |
| User company: |
ALSTOM Switzerland Ltd. |
| Brief information: |
Control and Supervision System (ABB Advant OCS) of the left bank Power Plant, covering 14 Units (x 700 MW), 500 кV GIS, Auxiliary Systems, Common station equipment and Spillway gates. |
| Scope of work: |
Participation in Supervision of the erection and commissioning works |
Project: Phu My 2.2 BOT Project 715 MW Combined cycle power facility
| Project details |
| User company: |
ABB – Germany |
| Brief information: |
ABB Symphony, Operate IT Process Portal B
Gas Turbines: General Electric with Mark-V turbine controllers;
Steam Turbine: General Electric with Mark-V turbine controllers;
HRSG (Boilers): NEM – Holland
500kV Switchyard: Alstom
6kV Switchboard: ABB Italy
0,4kV Switchboards: Clemessy
|
| Scope of work: |
Participation in Design and commissionining, Training of the personnel |
Project: Rehabilitation and modernization of WWTP Кubratovo, Sofia
| Project details |
| User company: |
“Sofia Water” JSCo, VA TECH WABAG Deutschland GmbH & Co. KG |
| Brief information: |
The design is developed on the basis of a signed contract EU-PHARE LSIF Part 5 Project BG9906.01 CONTRACT for the Rehabilitation and Upgrading of the Sofia, District Kubratovo, Waste Water Treatment Plant – Water Line.
The Project includes:
- Electrical installations 6kV – for the new transformers;
- Electrical installations and Distribution boards 0,4kV;
- MCC-s with all internal equipment;
- Instrumentation;
- Control system – PLC and SCADA;
- Lighting and Grounding;
|
| Scope of work: |
Full delivery of equipment, design, mounting, test and commissioning works, guaranty and after guaranty services |
Project: Continuous steel casting machine – “Kremikovtzi” – Line 1 and 2
| Project details |
| User company: |
“Kremikovtzi” Steel Plant and VAI Austria |
| Brief information: |
Implementation of:
- ABB Control System - 800xA;
- ABB Advant Controller AC 450;
- ABB ACS800 Drive systems
|
| Scope of work: |
Design, Application software, Startup and commissioning of Control Systems |
Project: Continuous automatic flue gas monitoring from organized sources for “TPP - boiler department “ and “Waste incineration” “Lukoil Neftochim Bourgas”
| Project details |
| User company: |
“Lukoil Neftochim Bourgas” JSCo |
| Brief information: |
Designing, supply of equipment, installation works, commissioning, staff training, services in “TPP - boiler department“ |
| Scope of work: |
- ABB Advance Cemas NDIR system cabinet with:
Uras 14 – for CO and O2; Limas 11UV – for SO2, NO and NO2;
- Dust measuring system D-R290 (DURAG)
- Volume flow measuring system D-FL100 (DURAG) with ABB transmitters for absolute pressure, difference pressure and temperature
- ABB controllers AC31 and SCADA Portal
|
Project: System for continuous control of noxious agent emissions in the atmosphere from the steam boilers - TPP “Varna”
| Project details |
| User company: |
TPP “Varna” |
| Brief information: |
Designing, supply of equipment, mounting works, commissioning, staff training, services |
| Scope of work: |
- ABB Advance Cemas NDIR system cabinet with: Limas 11UV – for SO2, NO and O2, Uras 14 – for CO and CO2
- Dust measuring system D-R290 (DURAG)
- Volume flow measuring system D-FL200 (DURAG) with ABB transmitters for absolute pressure, difference pressure and temperature
- ABB controllers AC 800C and Process Portal
|
Project: Continuous monitoring system of noxious agent emissions in the atmosphere - TPP “Russe East”
| Project details |
| User company: |
TPP “Russe East” |
| Brief information: |
Designing, supply of equipment, mounting works, commissioning, staff training, services |
| Scope of work: |
- ABB Advance Cemas NDIR system cabinet with: Limas 11UV – for SO2, NO and O2, Uras 14 – for CO and CO2
- Dust measuring system D-R290 (DURAG)
- Volume flow measuring system D-FL100 (DURAG) with ABB transmitters for absolute pressure, difference pressure and temperature
- Siemens controllers Simatic S7-300 and WinCC
|
Project: Construction and testing of Sofia Metro Extension – External electric power supply of TPS22 at Metro Station №9
| Project details |
| User company: |
Sofia Municipality |
| Brief information: |
According to the accepted diagram for power supply of the Sofia Metro, each odd number of Metro Station is supplied by an urban substation. According to the location of Metro Station No9, the nearest substation is “Rila” substation. The existing 10kV Switchgear in “Rila” substation is with equipment manufactured by “ABB” company.
Each one of the cells contains:
Vacuum circuit breaker type VD4, current transformers type TPU 45.13 with capacitor sensors, voltage transformers type TJ C4, protection type REF 542+. The protection allows for measurement of currents, voltages, cos ф, active powers, reactive powers. The protection permits to enter the values of current, voltage and time adjustments, set by the Employer has an ABB protection SPAD 346C. |
| Scope of work: |
"Start Engineering" JSCo has delivered, installed and commissioned a new section in 10kV Switchgear with 3 pcs. of new cells and has equipped the existing section with 2 pcs. of new cells. The type of the cells is ZS1–ABB. |
|  |