| | ¤ Home » Team » Branch Stara Zagora |  | Branch manager - dipl. eng. Veselin Velchev
“Start engineering” JSCo. Stara Zagora Branch performs tasks mainly in the regions of Stara Zagora, Haskovo, Yambol and Sliven.
Our main employers are Maritza East 2 TPP, Maritza East 3 TPP, "Neochim" - Dimitrovgrad, “Agrobiochim” - Stara Zagora, “Progress” JS Co. - Stara Zagora, “Preskov” JS Co., Gazosnabdyavane Ltd., Water Supply and Sewerage Stara Zagora, “Elektrorazpredelenie” Ltd. - Stara Zagora and many others.
The following contracts were performed in 2001:
- Maritza East 2 TPP
- Replacement of the excitation and part of the relay protections of Turbine Generator 4 and Turbine Generator 2 -complete engineering, including design, delivery, dismantling of the old and installation of the new equipment, produced by ŔÂÂ, tuning and start up.
- Control, signalization and tuning of the protections of the AC and DC motors, driving the pumps of the new oil system of Turbine Generator 2.
- Dismantling, installation, adjustment and starting up of new control panels UCS – 1 (Unit Control Shield 1)
- Dismantling, installation, tuning and start up of new I&C equipment of Turbine Generator 2.
- Water supply and Sewerage - Stara Zagora
- Waste Water Treatment Plant - Kazanlak - installation, tuning and start up of Electrical and I&C parts.
- Construction of cathodic protection of potable water pipeline in Yagoda village, including: design, delivery of cathodic stations, installation, tuning and start up.
- Gazosnabdyavane Ltd - Stara Zagora
Internal gas supplying of the following sites:
- “Hlebozavod” Ltd. - Stara Zagora
- “Menada” JS Co.
- MZ “Zheleznik”
- Oranzherii Ltd., etc.
Our main partners in execution of the contracts are the following organizations:
- Energoimport - export Ltd. - Stara Zagora
- ŔÂÂ - Bulgaria Ltd.
- FILKAB Ltd. - Plovdiv, etc. | |
|  |