| N |
Project Name |
User Company |
Application |
St/Up |
| 1 |
Syria |
SKET DESAK
GERMANY |
|
1985-
1990 |
| 2 |
Central Dispatch Center of NEK Convector Installation for
heating |
NEK |
Study, design, supply, mounting, erection and
commissioning, service. Main supplier: "YORK" |
1992 |
| 3 |
Maritza
East 2 TPP Unit 6 |
NEK |
design, supply of DCS (MIC 2000), I&C, erection and
commissioning |
1993 |
| 4 |
Kremikovtzi Metallurgical Complex Blast Furnace 3 |
Kremikovtzi JSCo |
(SIEMENS - TELEPERM & SIMATIC) design, supply of
I&C, electric equipment, etc., erection and
commissioning |
1994 |
| 5 |
Elevtricite de LIBAN |
HYUNDAI EDF |
Rehabilitation of power grid of LIBAN
Substations 132/66/15 kV – 52 pcs.
Transmition lines 132 kv – 8 pcs.
Transmition lines 66 kV – 11 pcs.
Mounting, start up and commissioning works. |
1994 |
| 6 |
Gas Compressor Stations Ihtiman, Petrich,
Lozenec |
BULGARGAS |
Supervision, start-up and commissioning of 10 gas
compressor stations (with 6,3 MW gas turbine motor each) and
gas prepare plant, gas signaling fire signaling and fire
fighting plants |
1995 |
| 7 |
Maritza
East 3 TPP Unit 1,2,3,4 |
NEK |
design, supply of DCS (MIC 2000), I&C, erection and
commissioning |
1995 |
| 8 |
Bobov
Dol TPP Unit 3 |
NEK |
design, supply of DCS (MIC 4000), I&C, erection and
commissioning |
1995 |
| 9 |
Sofia TPP: Water Heating
Unit 4 and 6 |
Toploficazia - Sofia |
design, supply, erection of Sigma - PCS 485, I&C,
electric equipment, etc. |
1995
1997
|
| 10 |
Maritza
East 2 TPP Unit 8 |
Open International Tender, financed by EBRD |
design, supply of DCS (MIC 4000), I&C, electric
equipment, supervision, erection and commissioning |
1995 |
| 11 |
Kremikovtzi Metallurgical Complex Agglomeration Plant |
Kremikovtzi JSCo |
design, supply of PLC Simatic S5-115, electric equipment,
I&C, erection and commissioning |
1995 |
| 12 |
Kremikovtzi Metallurgical Complex Continuous Reheating
Furnace |
Kremikovtzi JSCo |
design, supply of DCS (MIC 4000), I&C, erection and
commissioning |
1996 |
| 13 |
Devnya TPP |
NEK |
design consultation, implementation of all control
loops |
1996 |
| 15 |
Rousse TPP Unit 5 |
NEK |
design of DCS (MIC 4000) |
1996 |
| 14 |
“XACEKE” HPP
(2x25 MW)
|
Syria |
Substation 66/6 kV – 2 pcs.
Constaraction, statr up and commissioning works. |
1996-
1997 |
| 16 |
Sofia TPP Steam Generators
7,8,9 |
Toploficazia - Sofia |
design, supply of Sigma - PCS 485, I&C, electric
equipment, etc. (no control loops) |
1997 |
| 17 |
Sofia TPP Turbine
Generator Blocks 6,8 |
Toploficazia - Sofia |
design, supply of Sigma - PCS 485, I&C, electric
equipment, etc. (no control loops) |
1997 |
| 18 |
Sofia
TPP |
Toploficazia - Sofia |
Information System for Control and Optimization of the
Technologic Rates |
1997 |
| 19 |
Zemlyane
Heat Power Plant: Heavy oil plant, Water heating unit 1
& 2 |
Toploficazia - Sofia |
Design, erection, start-up and commissioning of I&C, electric
equipment, supply of Sigma - PCS 485 and programme |
1997
1999
|
| 20 |
Bobov
Dol TPP Unit 3 |
NEK |
Advanced Control of boiler turbine unit 3 |
1997 |
| 21 |
Peshtera HPP |
ABB |
participation in implementing and commissioning of Advant
OCS on 4 units and switch yard |
1997 |
| 22 |
"Gloria Palace" Hotel Sofia Air-conditioning and
ventilation installations |
"T&D" JS Co. |
Manufacturing, delivery, erection and commissioning;
service work. Main supplier: "DAIKIN" |
1997 |
| 23 |
Commercial Bank "UBB" JS Co. "Kniaginia Maria Louiza"
branch Sofia, Air- conditioning installation main hall |
"UBB" JS Co. |
Study, design, supply, mounting, erection and
commissioning, service. Main supplier: "YORK" |
1998 |
| 24 |
Varna
TPP Unit 6 |
NEK |
design, supply of TELEPERM XP, I&C, electric
equipment, etc. |
1998 |
| 25 |
Kremikovtzi TPP Unit 5 |
Kremikovtzi JSCo |
design, supply of DCS (MIC 4000), I&C, supervision,
commissioning |
1998 |
| 26 |
Sofia TPP Water Heating
Unit 1,2,3,5 |
Toploficazia - Sofia |
design, supply of Sigma - PCS 485, I&C, electric
equipment, etc. |
1998 |
| 27 |
Sofia TPP Steam Generators
4,5,6 |
Toploficazia - Sofia, Sofia |
design, supply of Sigma - PCS 485, I&C, electric
equipment, etc. (no control loops) |
1998 |
| 28 |
Sofia TPP, Turbine
Generator Blocks 4,5 |
Toploficazia - Sofia |
design, supply of Sigma - PCS 485, I&C, electric
equipment, etc. (no control loops) |
1998 |
| 29 |
Chaira
Pumped Storage HPP - Bulgaria, Units 3 and 4 |
NEK |
commissioning of TOSHIBA control system (TOSMAP-GS800
Series PLC) |
1998 |
| 30 |
Production market hall Gorubliane - Sofia Air-conditioning
and ventilation installations |
"Florina-Bulgaria" JS Co. |
Study, design, supply, mounting, erection and
commissioning, service. Main supplier: "DAIKIN" |
1998 |
| 31 |
Gas
filling plant of "Shell gas" Bulgaria
Benkovski, Plovdiv district |
Shell gas" Bulgaria |
Design, installation and commissioning of a control system
on the basis of SIEMENS S7-300 for control of propane-butane
and emergency facilities for fire fighting and degassing |
1999 |
| 32 |
Administration building "Hladilnika" - Sofia Convector
installation for cooling |
OVERGAS Holding |
Study, design, supply, mounting, erection and
commissioning, service. Main supplier: "YORK" |
1999 |
| 33 |
Maritza East 2 TPP |
NEK |
design, erection and commissioning works of control system
for Joint Voltage Control on 400kV and 220kV with Modicon
PLCs. |
1999 |
| 34 |
Guigang HPP China |
ABB |
participation in implementing, commissioning and tests of
Advant OCS (ABB) |
1999 |
| 35 |
Bobov
Dol TPP Unit 3 |
NEK |
system for calculation of efficiency and other technical
and economical parameters |
1999 |
| 36 |
Puklina Lime Plant |
Plena BG |
implementing and commissioning of I&C and electrical
project, frequency control of motors, PLCs S7-400,
visualization with InTouch 7.0 (Wonderware) |
1999 |
| 37 |
Kremikovtzi Metallurgical Complex Air Heater of Blast
Furnace 1 |
Kremikovtzi JSCo |
design, I&C, electric equipment, commissioning of
control loops with S7-400 PLCs, visualization with WinCC |
1999 |
| 38 |
Bobov
Dol TPP Unit 1,2 |
NEK HONEYWELL |
Design, commissioning works and optimization of Unit
Control System with TPS (Honeywell) |
2000 |
| 39 |
Union
Miniere Pirdop Med |
"Himremontstroi" JS Co. |
Delivery and manufacturing of el. boards, erection works,
tuning and commissioning of the technological equipment and
the regulated loops |
2000 |
| 40 |
Bobov
Dol TPP Unit 1,2 Varna TPP Unit 4,6 Maritza East 2 TPP Unit
6,8 |
NEK SIEMENS |
Design, erection and commissioning works of Turbine
Governors |
2000 |
| 41 |
Varna
TPP Unit 4,5 |
NEK SIEMENS |
Implementation of a digital dispatch control system |
2000 |
| 42 |
"Hilton" Hotel – Sofia Air-conditioning and ventilation
installations |
"Total Air – Trane" Bulgaria |
Manufacturing and mounting of air-distribution net,
erection and commissioning Main supplier: "TRANE" |
2000 |
| 43 |
Gas
filling plant of "Shell gas" Bulgaria
Benkovski, Plovdiv district
"Extension - stage 1" |
Shell Gas Bulgaria |
I&P erection, commissioning, Control
system updating. Redundancy of the CPU and the Operator's station
is introduced |
2000 |
| 44 |
"Radisson" Hotel – Sofia Air-conditioning and ventilation
installations |
"Radisson" Bulgaria |
Study, design, manufacturing and mounting of
air-distribution net, erection and commissioning works;
service Main supplier: "YORK" |
2000 |
| 45 |
Railway
Dupnitza – Kulata Electrification |
Balfour Beatty Rail - Germany |
Design, el. mounting, erection and commissioning works |
2001 |
| 46 |
UMICORE
Pirdop
Facilities, loading the convertor
bunkers |
UMICORE
Pirdop |
Design, installation and commissioning of a control system based on
SIEMENS SIMATIC S7-300, SIMOCODE DP and
PROFIBUS DP |
2001 |
| 47 |
Maritza
East 2 TPP FGD – Unit 7,8 |
NEK ABB |
Design and commissioning works with Control System
"Symphony" - ABB |
2001 |
| 48 |
Batak HPP |
ABB |
Participation in the design of Advant OCS on 4 units and
the switch yards |
2000/ 2001 |
| 49 |
Aleko HPP |
ABB |
Participation in the design of Advant OCS on 4 units and
the switch yards |
2001 |
| 50 |
Stomana
Pernik Metallurgical Complex Continuous Reheating Furnace
1 |
Stomana Pernik |
Implementation of a digital control system based on
Modicon Controllers (Schneider Electric) |
2001 |
| 51 |
HV
Station "Jadenitza" |
NEK |
Design and construction of a telemechanique system for
management and control |
2002 |
| 52 |
Plovdiv
Project for improvement of the environment |
MARUBENI Corp. Japan |
Manufacturing and delivery of el. boards, el. mounting,
I&C, erection and commissioning works |
2002 |
| 53 |
Neftochim – Bourgas Unit 12 in
TPP |
NEK |
design consultations, implementation of all control loops
with TDC 3000 (Honeywell) |
2002 |
| 54 |
Bobov
Dol TPP Group control of generator’s excitation |
Stomana Pernik |
Implementation of a digital control system based on
Modicon Controllers (Schneider Electric) |
2002 |
| 55 |
UMICORE
Pirdop
Flotation plant |
UMICORE
Pirdop |
Design, delivery, installation and commissioning of a
control system based on SIEMENS SIMATIC S7-300, SIMOCODE DP and
PROFIBUS DP |
2002 |
| 56 |
Maritza
East 2 TPP Group control of generator’s excitation |
NEK |
Design (hardware and software), delivery of equipment,
mounting and putting into operation |
current |
| 57 |
Metropolitan - Sofia Depot for
metro wagons Traction-lowering stations Metro stations 1 to
7 |
Metropolitan Sofia |
Design of automation systems, lighting and ventilation,
el. boards manufacturing, el. mounting, I&C, erection and
commissioning works |
current |
| 58 |
"Faians"
Plant - Kaspitchan Rationalization of the system for
production and of industrial and public heat energy |
"Faians" JS Co. |
Study, design, programming, mounting and dismounting
works, delivery of installations and equipment, erection and
commissioning works, estimation of the efficiency |
current |
| 59 |
WWTP
"Kubratovo" –Sofia Rehabilitation and modernization |
"Sofiiska voda" JS Co, VA TECH WABAG - Germany |
Full delivery, design, mounting, erection and
commissioning works- part "Electro" of the project |
current |
| 60 |
"Beli Iskar"
Dam |
"Sofiiska voda" JSCo |
Design (hardware and software),
specification and delivery of equipment, installation and
commissioning of the instrumen-tation system for dhe dam |
2002 |
| 61 |
Fu-Mi TPP, Vietnam (750MW) |
ABB Germany |
Design and starting-up and commissioning works of control
system "Symphony" - ABB |
current |
| 62 |
"The three gorges" HPP (left bank), China
(14x840MW) |
ALSTOM Power, Switzerland |
Starting-up and commissioning works and testing of control
system ADVANT OCS (ABB) of two units (840MW), Outdoors
Switchgear 500 kV and auxiliary power facilities |
current |